High Pressure Customized Office Chair Parts Aluminum Die Casting with Silk Printing
AD-0010
Delivery
EXW、FOB、FBA、DDP
minimum order
10 pieces
Supply Ability
100000pieces / Month
Country of Origin
Dongguan, China
Stock Time
30-90Day
Quantity
US $2.50 - US $3.00 / pieces
Office chair parts are an important component in ensuring the comfort and functionality of office chairs. These components include all parts from chair wheels, armrests, air lift cylinders to footrings and seat plates. The availability of these parts means that common wear and tear or damage to office chairs can be repaired, extending their lifespan and saving on replacement costs. There are various parts to choose from for different types and brands of office chairs, making it easy for individuals and businesses to replace and maintain their chairs for an efficient and comfortable working environment.
High Pressure Customized Office Chair Parts Aluminum Die Casting with Silk Printing
| Product Name | Aluminum alloy office chair parts | |||
| Materials | AZ91D, AM60B, AZ31B, A380,A413,A360, ADC12, A325, ZL102, ZL104 etc | |||
| Weight Range | 0.015-15kg (0.033-33lbs) | |||
| Process | 1 | Incoming Material Inspection | 8 | Drilling and Tapping |
| 2 | Tooling Manufacturing and Preparing | 9 | Cleaning and Passivation | |
| 3 | Materials Melting | 10 | Surface Finish | |
| 4 | Die Casting | 11 | Silk Printing | |
| 5 | Degating | 12 | Appearance Inspection and Inspections | |
| 6 | Deburring | 13 | Final Inspection Report for Products | |
| 7 | Polishing | 14 | Parts Delivery | |
| Drawings | Provided by customers or Design according to samples provided | |||
| Drawings Format | Pro/E, AutoCAD, SOLIDWORK, CAXA, UG, CAD, CAM, CAE, STP, IGES, etc. | |||
| Die Casting Mould | Designed and manufactured in House | |||
Product Feature
1.Ten years experiences-With more than ten years experiences in plastic injection, die casting and rapid prototyping fields, we own lots of sub-contract factories in these fileds
2.Engineering-More than 30 senior design, project and quality engineers are working with us. Most of them are served in this field more than 10 years till now.
3.400 + qualified suppliers-Professional Supplier Management Systems
4.Skilled Staff-Most of our staffs on the production lines are well-trained. Many of them are worked with us for at least 5 years. They know customers' requirements for the quality very well. And our quality and project engineers will follow up during all the periods and offer suggestions accordingly.
5.OEM&ODM services are welcomed.
6.Quick response& Short Leadtime
Quotation and DFM will be provided in two days after drawings received. Normally, it takes 30 days for T1 samples for die casting and 7 days for CNC machining prototypes.
Dongguan Tianyao Hardware Industry Co., Ltd. was established in 2008 in Liaobu Town, Dongguan City. It is an industrial domestic enterprise specializing in the production of precision die-casting. Since its establishment, the company has a series of supporting facilities, including raw materials, molds, die-casting, polishing, deburring, CNC processing, lathes, surface treatment, full inspection, and testing. In order to align the company's product quality management with internationalization and promote rapid and good development, we have obtained ISO9001/IATF16949 certification
Q1. Where are your company / factory?
1.Ten years experiences-With more than ten years experiences in plastic injection, die casting and rapid prototyping fields, we own lots of sub-contract factories in these fileds
2.Engineering-More than 30 senior design, project and quality engineers are working with us. Most of them are served in this field more than 10 years till now.
3.400 + qualified suppliers-Professional Supplier Management Systems
4.Skilled Staff-Most of our staffs on the production lines are well-trained. Many of them are worked with us for at least 5 years. They know customers' requirements for the quality very well. And our quality and project engineers will follow up during all the periods and offer suggestions accordingly.
5.OEM&ODM services are welcomed.
6.Quick response& Short Leadtime
Quotation and DFM will be provided in two days after drawings received. Normally, it takes 30 days for T1 samples for die casting and 7 days for CNC machining prototypes.








